Project #25-108
Gramlich ADU
133 W Cullumber Ave
Latest Bid
$85,480
Square Footage
1,864
Units
—
Scope Class
SABS + Trades
Plan Stage
Project Lifecycle
Plans & Estimates
Plan Set
No plan set linked.
Estimate
No estimate linked.
Notes & Correspondence
No notes yet.
Scope Summary
Labor-only bid: SABS structural shell + foundation/slab + rough plumbing + rough/finish electrical. Homeowner takes all finishes including doors and windows. HVAC by Owner mini-split. Strata material + design ($77,008) pass-through, Owner pays Strata direct.
Internal Notes
Strata bid received: Xtrata Estimate 05.05.26 ($77,008 = SABScrete $40,688 + EPS Foam $26,196 + P/U Adhesive $3,600 + Design $6,524). All-in project cost Owner sees: $162,488 (~$87/SF). MoE ±12% on our scope only; Strata pass-through firm. Hardens to ±8% with site walk + geotech + final approved set.
Bid Versions
Supervision $1.22 → $4.22/SF; All-In Project Summary block added; Strata pass-through tagged 'Firm — no MoE applies.' Sent to Val + Muzafer 2026-05-19.
$85,480