LÏEF Development
SABS Bid TrackerLÏEF Development · Internal
← Back to Projects

SABS Bid

DC Transports — Mesa

Latest Bid

$503,542

Square Footage

10,500

Units

Scope Class

SABS + Trades

Plan Stage

Project Lifecycle

Received
Takeoff
Bidding
Submitted
Awarded
Start

Notes & Correspondence

Adding a note also updates last-correspondence date for this project.

No notes yet.

Project Brief

Mesa PEMB fully converted to SABS. 10,500 SF footprint verified off plans (175x60). Submitted to Val 2026-06-10 at $503,542.

Work Scope

Concrete (footings + slab) + SABS install & structural coat (ext + interior walls + roof + beams), bundled $8.80/SF. Strata material pass-through.

Scope Summary

Full SABS structural shell + concrete. 10,500 SF (175x60) verified off plans. Ext + interior walls + roof (12") + beams + structural coat.

Internal Notes

SUBMITTED to Val 2026-06-10. $503,542 (+/-14%). Install+coat bundled $8.80/SF -> labor:material 0.76 (Refuge/Mercury parity). Slab an allowance pending site visit. Strata takeoff to reconcile (490 LF/12,250 SF vs plan 470 LF/10,500 SF). Source: Email threads 19de610e843835c3 (5/2 initial), 19e2c826e4443e96 (5/15 update). DC-Transports-Mesa/PROJECT-INFO.md.

Bid Versions

v1 Full-Project BudgetMay 14, 2026

Initial full-project budget v1.0 (HTML + PDF + Python build script). $176/SF footprint (9,258 SF). Strata material pass-through $207,079.82 + ACG direct $1,116,506 + GC 6% + OH 8% + Profit 12% = $1,627,275.82 grand. MoE band $1,272,227 - $1,982,325.

$1,627,276

v2 Full SABS Shell (SUBMITTED)Jun 10, 2026

Full SABS structural shell (ext + interior walls + roof 12" + beams + structural coat) + concrete. 10,500 SF verified off plans (175x60). Install+coat bundled $8.80/SF (labor:material 0.76, Refuge/Mercury parity). Strata material pass-through $328,712.78. Markup O&A 10% + Profit 12%. MoE +/-14%. Submitted to Val.

$503,542

-$1,123,734 vs v1 Full-Project Budget